Work begins on Rob’s workshop
Workshop drawings, marked up.Gable end layoutRear wall assembly in the workshopA-frame trussEnglish tying joint. Post detailEnglish tying jointCutting the mortice angleMarking up for offset pegsRoof layout in the workshopPrincipal raftersReady for site construction
December 2017
All complete at the fishermans cottage.
Happily moved in at the fishermans cottage. Warm and cosy.
Rob’s workshop
Elevations for the oak workshop3D depiction of the oak frameLooking at the workshop through the large gable end doorsView over orchard with the oak shutters closed
On reaching retirement Rob, a highly skilled engineer wanted a special workshop built with ancient timber engineering skills in which he can use his engineering in the future. […]
October 2017
The Balcony goes up
After some tricky detailing on the face frame the balcony is put into place. All the existing joinery and the new pieces lock into place perfectly.