June 2019

Porch

May 2019

Walkway

April 2019

Truss

March 2019

Barn

Wellness Centre balcony

January 2019

All Saints Church

February 2018

Work begins on Rob’s workshop

Workshop drawings, marked up.Gable end layoutRear wall assembly in the workshopA-frame trussEnglish tying joint. Post detailEnglish tying jointCutting the mortice angleMarking up for offset pegsRoof layout in the workshopPrincipal raftersReady for site construction

December 2017

All complete at the fishermans cottage.

Happily moved in at the fishermans cottage. Warm and cosy.

Rob’s workshop

Elevations for the oak workshop3D depiction of the oak frameLooking at the workshop through the large gable end doorsView over orchard with the oak shutters closed

On reaching retirement Rob, a highly skilled engineer wanted a special workshop built with ancient timber engineering skills in which he can use his engineering in the future. […]

October 2017

The Balcony goes up

After some tricky detailing on the face frame the balcony is put into place. All the existing joinery and the new pieces lock into place perfectly.