A complex beam and raft foundation was required as the house is in a potential flood plain and the foundation neede to be built over a main sewer and tied to the existing (debatable!!) house foundation. All taking place in a very restricted area.
The shell composedof 6×2 softwood framework is then erected and the building starts to take shape.
- Complex steel formwork for beam and raft foundations
- Levelling the floor between old and new